Smiths & Co Building Ltd
Smiths & Co Building Ltd
Call 07956 757412 WhatsApp us
Completed two-storey extension with dormer windows in the Forest of Dean

Extensions & home additions

More space, built to last.

Single and double-storey extensions across the Forest of Dean, handled by one team from first drawing to final coat of paint, no sub-contractor merry-go-round.

What we build

Extensions that feel part of the original home

Whether you need a bigger kitchen, an extra bedroom or a whole new living space, a well-built extension adds room and value without the upheaval of moving. We take on the lot: rear and side extensions, two-storey additions, wrap-arounds and kitchen-diners.

Because the same Smiths & Co team handles groundworks, brickwork, structure, roofing and finish, the details line up, matched brickwork, tidy rooflines and a new space that looks like it was always meant to be there.

We’re partway through one in Cinderford right now, and finished one in Coleford recently with new render and plasterboard throughout.

  • Single-storey rear & side
  • Double-storey additions
  • Kitchen extensions & diners
  • Wrap-around extensions
Extension blockwork under construction, tied into the existing brickwork and roofline

All under one roof

Everything your extension needs, in-house

One point of contact and one team on site, so nothing falls between trades.

Design & planning support

Help with drawings, planning applications and building-regs sign-off, so the paperwork is handled before we break ground.

Groundworks & foundations

Footings, drainage and slab laid to spec and inspected, the solid base every good extension stands on.

Brickwork & structure

Matched brick and blockwork, steel beams and structural openings, tied neatly into the existing house.

Roofing & weatherproofing

Flat or pitched roofs, fascias, guttering and flashing, finished watertight and built to match.

Electrics & plumbing

First and second-fix coordinated with trusted local sparkies and plumbers, so heating, lights and water are ready to go.

Plastering & finish

Plastering, flooring and decorating right through to the last coat, handed over ready to use.

How it works

From first call to finished room

A clear, five-step process so you always know what’s happening next.

  1. 1

    Free consultation

    We visit, talk through what you want and give you an honest, no-obligation quote.

  2. 2

    Design & planning

    Drawings, planning and building-regs sorted, with a start date booked in.

  3. 3

    Groundworks

    Footings and foundations dug, poured and signed off, ready to build up from.

  4. 4

    Build & structure

    Walls, steels, roof and services, brought weathertight and kept tidy throughout.

  5. 5

    Finish & handover

    Plastered, decorated and cleaned up, handed over ready for you to enjoy.

Before & after

A real rear extension, start to finish

From blockwork and insulation to a fully rendered, finished room, all by the same team.

Extension mid-build: blockwork walls with cavity insulation, no roof yet Before
The same extension finished, rendered, with roof and windows complete After

Recent extension work

A closer look

Blockwork extension build in progress
Blockwork walls rising off the footings
Blockwork walls built up ready for the roof
Walls up and ready for the roof
A finished extension interior with fitted bench seating, a timber worktop and roof lights
Finished inside, fitted seating and roof lights
A finished flat-roof extension, rendered and painted, with a blockwork retaining wall alongside
Finished flat-roof extension, rendered and painted
A finished rear extension viewed from the garden, render and grey trim
Finished rear extension from the garden
An extension plastered out with a roof light and french doors fitted, ready to decorate
Plastered out and ready to decorate

★★★★★

“Dan and Brad did a great job… many people have complimented it as they walk past.”
Philip Beech · Google review

Common questions

Extensions, answered

Many single-storey extensions fall under permitted development, but it depends on size and your property. We’ll tell you early on whether you need a full application, and help you through it either way.

A typical single-storey rear extension runs around 8–12 weeks on site once we start, depending on size, ground conditions and finish. We give you a realistic timeline with your quote, not an optimistic one.

Yes. We build to current building regulations and coordinate the inspections at each stage, from foundations through to completion, so your extension is signed off properly.

Cinderford, Coleford, Lydbrook, Bream and across the wider Forest of Dean and Gloucestershire. If you’re nearby and not sure, just ask.

Building out usually means a few other jobs too

An extension starts with the ground and finishes with the roof, and plenty of homeowners use the upheaval as the moment to redo the kitchen as well.

Ready for more space?

Let’s talk about your extension

Tell us what you’re planning and we’ll come out, take a look and give you a free, no-obligation quote.

WhatsApp Get a quote
Chat on WhatsApp